Background and location

VetyAlfa has initiated a significant green hydrogen refining project in Utajärvi, Northern Ostrobothnia. In its scope the Mustikkakangas project aligns with VetyAlfa’s Vaala and Kemijärvi projects announced in 2024, which target the development of hydrogen separation and processing facilities with a capacity of 200–1,000 MW.

The Mustikkakangas project area is located on municipally owned land and covers approximately 20 hectares. A local zoning process is currently underway, and the planning work carefully takes into account the environmental values of the area. The location offers strong logistical advantages, as the site has access to a nearby railway network, enabling efficient transportation of raw materials to the facility and finished products to markets.

Hydrogen production ja derivates

The operation of the refinery would be based on renewable electricity. The electrolysers required for hydrogen production would receive part of their power from a solar power plant developed in parallel, with a planned capacity of approximately 100–200 MWp.

The production facility would be connected to the regional electricity grid at either the 110 kV or 400 kV level.

At full capacity, the refinery could produce up to 180,000 tonnes of green hydrogen per year. The specific hydrogen derivatives will be defined as the project progresses, based on market demand. Potential end products include e-methane, e-methanol, ammonia, and sustainable aviation fuel (SAF).

Project development status

Utajärvi Mustikkakangas, the town zoning is currently underway.

The environmental impact assessment (EIA) process for the project will start in 2025. The project could be completed and the new hydrogen facility could start up 2028-2029.

Investment  value and regional impact

Depending on the selected hydrogen derivatives and final capacity, the estimated investment value of the hydrogen refinery is approximately EUR 1–3 billion.

The added value of the end products from local wind, solar and hydro would largely remain in the region.

The project would generate substantial regional value, as the value added from products manufactured using locally produced wind and solar power and water would largely remain within the region. Direct employment effects in refinery operations are estimated at up to 120 jobs, with significantly higher indirect employment impacts across technology supply chains, maintenance services, and subcontracting.

In addition, the project would increase tax revenues for the Municipality of Utajärvi through property tax, municipal and corporate income tax, as well as income tax generated by local employment.

Project timeline

1. Preliminary planning
2. Land use planning in preparation
3. Land use planning and Environmental impact assessment
4. Building permit process
5. Investment and building
1. Esiselvitys
2. Kaavoitus
valmistelussa
3. Kaavoitus
käynnissä
4. Rakennuslupamenettely
käynnissa
5. Investointi ja rekentaminen

Hankkeen eteneminen

1.

2.

3.

4.

5.

1. Preliminary planning
2. Land use planning in preparation 
3. Land use planning and Environmental impact assessment
4. Building permit process
5. Investment and building

Contact

Antti Tanskanen

Group CEO

antti.tanskanen@vetyalfa.fi

+358 44 977 0409

Reija Knuutila

Business Director

reija.knuutila@vetyalfa.fi

+358 50 379 3735

Location

Usein kysyttyä

Our pricing includes panel hardware, installation, system design, inverter, monitoring tools, and warranty based on the plan you choose.

Yes! We help you navigate available government subsidies, tax credits, and offer flexible financing options for qualified buyers.

Most clients save up to 60–80% on their monthly electricity bills, depending on energy usage and system size.

For residential systems, installation typically takes 1–3 days after permits and inspections are completed.